Installation and Testing of Hub Well No. 5A, Metropolitan Domestic Water Improvement District (MDWID) –, Tucson, AZ

Installation and Testing of Hub Well No. 5A, Metropolitan Domestic Water Improvement District (MDWID) –, Tucson, AZ

Chris, under a former employer, provided technical services related to the drilling, construction, & testing of the MDWID Hub No. 5 drinking water supply well. Chris assisted with preparing the technical specifications, prepared & obtained required drilling & discharge permits, conducted pre-bid & pre-construction meetings, & provided oversight during the drilling, construction, geophysical logging, depth-specific zonal sampling, aquifer testing, & well development. Chris also assisted with the selection of depth-specific groundwater samples for determining the final well design, & prepared the completion report, including the final pump design recommendations for the well.

Gary Burchard, Hydrologist II (MDWID) - “Chris Courtney assisted with the oversight of the drilling, installation & testing of Metro Water District’s Hub Well No. 5a. Specifically, Mr. Courtney either supervised or conducted lithologic logging, gyroscopic survey zonal sampling, construction inspection, & aquifer & step-rate testing. Additionally, Mr. Courtney managed subcontractors & the bid process. Mr. Courtney executed all of these tasks in an exemplary & professional manner.”

Agua Fria National Monument (AFNM) Intra Basin Water Management (IBWM) Project, Bureau of Land Management (BLM) – Yavapai County, AZ

Agua Fria National Monument (AFNM) Intra Basin Water Management (IBWM) Project, Bureau of Land Management (BLM) – Yavapai County, AZ

Desert Rock Energy Project (DREP) Water Resource Study, Sithe Global Power, Navajo Nation – Four Corners Area, NM

Desert Rock Energy Project (DREP) Water Resource Study, Sithe Global Power, Navajo Nation – Four Corners Area, NM